Answer: What is Aberdeen Western Peripheral Route mean?

The Aberdeen Western Peripheral Route (AWPR), unofficially also the City of Aberdeen Bypass, is a major road that wraps around the city of Aberdeen, Scotland. The road stretches north from Stonehaven through Kincardineshire and crosses both the River Dee and River Don before terminating at Blackdog. The main stretch of the AWPR is 22 miles (35 km) in length.

The AWPR also includes the 4-mile (6.4 km) A956 spur that links the bypass to the A92. The construction of the AWPR was coupled with extensive upgrades to the A90 continuing north with the 9-mile (14 km) Balmedie to Tipperty dual carriageway, supplanting the existing road which was subsequently detrunked and is now the B977. The AWPR's primary route is designated as part of the A90, with the original A90 now renamed the A92, which now connects with the AWPR at both of its ends.

The road is predominantly rural, crossing mainly through farmland and forest while skimming past built-up areas. The AWPR is legally classed as a special road by the Scottish Government. This means that the bypass is governed under motorway restrictions. The road itself is near-motorway grade with all junctions being grade-separated with adjoining slip roads (the only exception being the Cleanhill roundabout), a full-length continuous concrete step barrier, large road signage, legal prohibition of stopping and reversing alongside restriction to Class I and II vehicles, barring non-motorway traffic from using the bypass altogether. The road however lacks hard shoulders and instead includes emergency laybys while its statutory instrument prevents it from being a motorway. Despite this, the AWPR is not a standard primary A-road and is viewed as being a motorway in all but name. It is one of the most important trunk roads in Scotland.

The Balmedie to Tipperty road is not part of the bypass despite being built in conjunction with it and therefore not bound by the AWPR's statutory instrument, making it an ordinary dual carriageway. First announced in January 2003, the road was approved by Scottish Ministers in late 2009 with the original costs estimated at between £295 million and £395 million. Construction on the AWPR began on 19 February 2015. The final section opened exactly four years later on 19 February 2019.

reference

Take Quiz To Earn Credits!

Turn Your Knowledge into Earnings.




Give Rating
Report
Write Your Comments or Explanations to Help Others
Comments(0)





Miscellaneous in Governmental
Miscellaneous in Governmental

Ever curious about what that abbreviation stands for? fullforms has got them all listed out for you to explore. Simply,Choose a subject/topic and get started on a self-paced learning journey in a world of fullforms.

Explore Other Libraries

X

Important Governmental Links





Copyright (c) 2021 TuteeHUB

OPEN APP
Channel Join Group Join