Cross River Tram (formerly Cross River Transit) was a Transport for London (TfL) proposal for a 10-mile (16 km) tram system in London. It was planned to run on a north–south route from Camden Town in the north, via King's Cross, to Peckham and Brixton in the south.
The Cross River Tram scheme was proposed to relieve overcrowding on the London Underground and was due to begin operation by 2016. The project was cancelled by then mayor of London Boris Johnson in 2008 due to funding problems. A 2016 review of the CRT plan by subsequent mayor Sadiq Khan concluded that the CRT project would not be reopened at that time.
referenceEver curious about what that abbreviation stands for? fullforms has got them all listed out for you to explore. Simply,Choose a subject/topic and get started on a self-paced learning journey in a world of fullforms.
Allow To Receive Free Coins Credit 🪙